Unplanned shutdown is the costliest "silence" on a production line. Faced with the high price of unexpected stops, how can a medium voltage drive leverage its high reliability to reduce the risk of unplanned shutdown? Read on to discover Nancal Electric's solution.
Demands: A single module failure does not cause the inverter stopped. NANCAL Electric Solution:Neutral piont shifting technology of power cell bypass.MV drive will be bypassed automatically and keep running normally, when the faults of one cell exists. If compared with traditional bypass technology
Recently, Nancal Electric won the bid for a megawatt-level high-speed PMG four-quadrant VFD project.
Demands: a single module fault should not result in the inverter shutdown NANCAL Solution: Power cell bypass with neutral point shifting technology Power cell bypass When a power cell (module) fails, MV drive can automatic bypass failure power cell and keep running without trip. If compared with tr
Demands: Need equipment to work continuously and steadily NANCAL Solution: ProCon (Process Continuous) is a technological package which could ensure the continuous operating of MV drive under short-term fluctuations of power supply caused by thunder, storm or other reasons. ProCon integrates multipl
Wenchang Platform-Wet Gas CompressorIndustryOffshore-Drilling platformObjectiveThe project is located on a drilling platform in the South China Sea. The natural gas extracted from the wellhead is pressurized by the compression system and dehydrated in the dehydration system.
IndustryPetrochemical ObjectiveIn petrochemical industry, the one of main energy consuming equipment is the pump. The traditional drive solution can only run at the grid with fixed speed through the valve throttling to hydraulic coupling for speed regulation.
Industry MetallurgyObjective Binxin Steel is one of the leading metallurgy company established in 2008. In this project, there were two units of 10kV 6200kW sintering fan with synchronous motor.
IndustryMiningObjectiveAccording to the environmental requirements, the offgas in coking plant needs to be desulfurized and denitrified before discharged.There are 4 induced draft fans on the customer site to guide the coking flue gas to the desulfurization tower and denitrification reactor.
IndustryTest Bench-Wind TunnelObjetciveThere are totally seven units of compressors and two bus bars at site,3*1000kW motors are on busbar I, 4*1300kW motors are on busbar II.
2m×1.5m Acoustic Wind Tunnel Test Bench Project of Aerodynamic Research InstituteIndustryTest Bench-Wind TunnelObjective2m×1.5m Acoustic Wind Tunnel Test Bench Project of Aerodynamic Research InstituteThe rated voltage of compressor: 6kVRated power:1550kWInput voltage: 10kVSolutionBase on the acoust